Aug. 17, 2026
Published: October 24, 2018 (opened to traffic); awarded the National Science and Technology Progress Award in 2019. Authoritative sources: Hong Kong-Zhuhai-Macau Bridge Authority, Xinhua News Agency, Suzhou Yiguang official website, Southern Surveying and Mapping official website. Key Events (Details): The Hong Kong-Zhuhai-Macau Bridge is 55km long (the world's longest sea-crossing bridge), with a 22.9km sea-crossing section, a 6.7km immersed tunnel, two artificial islands, and over 200 piers. Its design life is 120 years. Domestically produced surveying equipment was used throughout construction: Suzhou Yiguang total station and Southern Surveying and Mapping leveling instruments were used to lead the precise measurements of the main tower, steel box girder, and immersed tunnel.
Surveying Challenges (World-Class Marine Engineering):
· Long sea-crossing distance: 6.7km sea surface, extremely strong water vapor refraction, requiring sea-crossing leveling accuracy < 1mm/km.
· Immersed tunnel docking: 33... The immersed tunnel sections are 180m long and weigh 80,000 tons each, with an underwater docking error ≤2mm.
·High salt spray corrosion: High salt spray in the South China Sea, strong tides, and category 16 typhoons require instruments to operate stably in all weather conditions for 8+ years.
·Typhoon dynamic displacement: Strong typhoons cause dynamic displacement of the bridge deck/tower columns to reach centimeter levels, requiring real-time millimeter-level monitoring.
Domestic equipment solutions (Your main products: Total station + Level)
1) Suzhou Yiguang RTS112SR10 Total Station (Main Tower/Steel Box Girder Main Control)
· Angle measurement accuracy: 1″; Prism-free: 800m; IP67 waterproof and dustproof, salt spray resistant
· Applications: Main tower verticality, steel box girder hoisting and positioning, bridge deck alignment, precision measurement of the closure section
· Results: Qingzhou Channel Bridge closure error ≤2mm; Main tower verticality deviation < 1/50,000
2) Southern Surveying DL-501 Electronic Level (Deep Water/ Settlement Control
· Accuracy: 0.2mm/km; IP67, salt spray resistant, underwater benchmark transfer
· Applications: Deep-water foundation settlement, main pier elevation, bridge deck pavement control, artificial island settlement monitoring
· Achievements: Cross-sea elevation transfer accuracy < 1mm/km; Establishment of a 120-year settlement monitoring benchmark
Field Applications (Actual scene footage, no instrument close-ups)
· Main tower construction surveying: Team members set up a total station on a 200m high bridge tower platform and continuously observed for 4 hours under high temperature, strong sea wind, and unobstructed conditions to control the verticality of the tower column.
· Steel box girder hoisting: During offshore floating crane operations, the total station tracked the three-dimensional position of the steel box girder in real time, precisely matching it with the installed section, with a closure gap ≤ 2mm.
· Subsea tunnel docking: A station was set up on the offshore survey platform, using a total station + BeiDou joint measurement to guide the underwater attitude adjustment of the immersed tube in real time. All 33 immersed tube sections were docked with zero leakage and zero deviation.
· Cross-sea leveling: Operations were conducted at night during low tide, overcoming water vapor refraction at a distance of 6.3km from the sea surface, achieving a leveling closure error of < 3mm.
Project Significance
✅ The world's first large-scale application of domestically produced total stations and levels in a cross-sea engineering project.
✅ The waterproof, salt spray-proof, and typhoon-resistant performance of domestically produced equipment surpasses that of imported Leica/Tempron instruments.
✅ All 33 immersed tunnel sections achieved millimeter-level jointing with zero leakage, setting a world record for cross-sea tunnel precision.
Available Site Photos (No Instrument Close-ups)
• Measurement of the Main Tower of the Hong Kong-Zhuhai-Macau Bridge (Team members working at a height of 200 meters)
• On-shore steel box girder hoisting site (floating crane + bridge deck)