Total Length: 55 km (world's longest sea-crossing bridge), with a 22.9 km sea-crossing section and a maximum water depth of 45 m.
Main Structure: Bridge-island-tunnel combination, 6.7 km immersed tunnel, 2 artificial islands, 200+ bridge piers.
Environment: Lingdingyang Bay, South China Sea, prone to Category 16 typhoons, high salt spray corrosion, strong tides, and frequent sea fog.
Design Life: 120 years, total investment approximately RMB 120 billion.
Aug. 17, 2026
Surveying Challenges
• Long-distance sea crossing: 6.7 km undersea tunnel, high visibility at sea, strong water vapor refraction, sea leveling accuracy requirement <1 mm/km.
• Immersed Tunnel Connection: 33 immersed tunnel sections, each 180 m long, connection error ≤2 mm/km. mm, underwater positioning is extremely difficult
• High corrosive environment: Salt spray strongly corrodes the electronic and optical components of the instrument, requiring stable operation around the clock
• Typhoon impact: 3–5 strong typhoons per year, large dynamic displacement of bridge deck/tower column, requiring real-time millimeter-level monitoring
Technical Challenges
Domestic Surveying Solutions
Brand: Suzhou Yiguang (FOIF) / Southern Surveying, 100% domestic
(1) Suzhou Yiguang RTS112SR10 total station (main tower/steel box girder control)
Angle measurement accuracy: 1″; Prism-free: 800 m
Application scenarios: Main tower verticality, steel box girder hoisting positioning, bridge deck alignment, precision measurement of closure section
Key role: Qingzhou Channel Bridge closure accuracy ≤2 mm; main tower verticality deviation <1/50,000
(2) Southern Surveying DL-501 electronic level (deep water/settlement control)
Accuracy: 0.2 mm/km; waterproof and dustproof IP67
Application Scenarios: Deep-water foundation settlement, main pier elevation, bridge deck pavement control, artificial island settlement monitoring
Key Role: Cross-sea elevation transfer accuracy <1 mm/km; 120-year settlement monitoring benchmark
On-site Application
Key Equipment Used
Main tower construction surveying
Surveyors set up a total station on a 200 m high bridge tower platform, conducting long-term observations under high temperature and strong sea winds to control the verticality and alignment of the tower columns.
Steel box girder hoisting
Floating crane operation at sea; the total station tracks the three-dimensional position of the steel box girder in real time, precisely matching it with the installed sections, controlling the closure gap within 2 mm.
Undersea tunnel dockin
A surveying platform is set up at sea; the total station + BeiDou joint measurement provides real-time guidance for underwater attitude adjustment of the immersed tubes, ensuring precise docking of all 33 immersed tube sections.
Cross-sea leveling
Operation during nighttime low tide, overcoming the 6.3 km sea surface water vapor refraction, achieving a cross-sea leveling closure error of <3 mm.
Key Achievements
✅ Closure Accuracy: The closure error of the steel box girder of the Qingzhou Channel Bridge is ≤2 mm, setting a world record for precision in cross-sea bridges.
✅ Immersed Tunnel Connection: All 33 immersed tunnel sections were connected with zero leakage and zero deviation, with a connection accuracy of ≤2 mm.
✅ Marine Environment Reliability: Stable operation for 8 consecutive years under 16-level typhoons and high salt spray corrosion; the waterproof and corrosion-resistant performance of domestically produced equipment surpasses that of imported equipment.
✅ Industry Benchmark: Pioneering the large-scale application of domestically produced total stations and levels in world-class cross-sea mega-projects, becoming a global benchmark for cross-sea engineering.