The Heart of Sea Breeze has been officially shipped from Nantong, Jiangsu to the Yangjiang Sea area in Guangdong. In the previous slow and lengthy loading and transfer process, the Xingruida TS10 series measuring robot participated in the entire inspection process, providing a solid guarantee for the construction safety of this sea giant
Aug. 17, 2026
Project: Offshore Flexible HVDC Converter Station — "Heart of the Sea Wind"
Client: China Three Gorges Group | Contractor: Jiangsu Marine Engineering Co., Ltd.
Location: Qingzhou Sea Area, Yangjiang, Guangdong Province, China
Scope: Dimensional monitoring, structural deformation survey, installation alignment during offshore transfer
Equipment Used: TS10 Series Robotic Total Station, GNSS RTK System, Precision Optical Level (DSZ3-32A)
Project Duration: 8 months (construction phase) + 15 days (offshore transfer)
Project Background The "Heart of the Sea Wind" is the world's largest and highest-capacity offshore flexible HVDC converter station, designed to transmit 2,000 MW of clean wind power from the Guangdong offshore wind farm to the mainland grid. Weighing 25,000 tons and standing 44 meters tall, this mega structure required millimeter-level precision monitoring during its construction in Nantong and subsequent 1,090-nautical-mile sea transport to the Yangjiang installation site.
Any deviation in structural alignment during the loading and transfer process could compromise the integrity of critical electrical equipment and result in costly delays. The client required continuous, high-accuracy dimensional surveying throughout the entire operation — from factory construction to offshore positioning.
Technical Challenges
Mega-Scale Structure
At 25,000 tons and 44m height, the converter station required multi-point monitoring across a large, complex geometry. Traditional manual surveying was insufficient for continuous real-time tracking.
Environmental Constraints
Construction in Nantong followed by a 1,090-nautical-mile sea transport meant the survey team had to operate in both shipyard and offshore environments, with wind, waves, and tidal variations affecting measurements.
Millimeter-Level Tolerance
Electrical equipment installation demanded positional accuracy within 2-3 mm. Any structural deformation during transport had to be detected immediately to prevent damage.
Continuous Monitoring Requirement
The offshore transfer took 15 days. The client needed round-the-clock monitoring during critical phases of loading, transit, and installation.
Our Solution Star-Geo Meridian supplied a comprehensive surveying package and field support team equipped with TS10 series robotic total stations, specifically designed for automated, high-precision monitoring:
TS10 Robotic Total Stations for automated target tracking and real-time coordinate measurement across multiple monitoring points on the structure.
GNSS RTK receivers for establishing the primary control network and georeferencing the offshore coordinate system.
Precision Optical Levels (DSZ3-32A) for vertical deformation monitoring of the foundation and support structure.
24/7 automated monitoring with dedicated shift teams during the loading and offshore transfer phases, with instant reporting of any detected movement.
Data processing and analysis in real time, enabling the engineering team to make immediate decisions on structural bracing and load distribution.
Post-transfer as-built survey documenting the final position and confirming all tolerances were met.
Key Equipment Used
TS10 Series Robotic Total Station
Automated prism tracking, 0.5" angular accuracy, 1mm+1ppm distance accuracy, IP65 waterproof rating for offshore operation.
GNSS RTK System
Dual-frequency receiver with 10mm+1ppm horizontal accuracy, used for primary control establishment and georeferencing.
Precision Optical Level (DSZ3-32A)
DS05 accuracy (0.5mm per km double-run) for foundation settlement monitoring and vertical alignment checks.
Survey Prisms & Targets
360-degree prisms mounted at critical structural points for continuous automated tracking.
Project Results
The "Heart of the Sea Wind" was successfully loaded and transported 1,090 nautical miles without any structural damage or equipment misalignment.
All 12 monitoring points remained within the 3mm tolerance throughout the 15-day offshore transfer.
Zero rework required after installation — all electrical equipment aligned perfectly with design specifications.
Client commendation for the survey team's rapid response and accurate data reporting during critical phases.
Successful commissioning of the world's largest offshore HVDC converter station, transmitting 2,000 MW of clean power to the Guangdong grid.
Client Feedback "The Star-Geo Meridian team provided exceptional surveying support throughout this record-breaking project. Their TS10 robotic total stations delivered reliable, real-time data that allowed us to track every movement of the structure during the offshore transfer. We completed the installation on schedule with zero tolerance issues — a testament to the precision of the equipment and the expertise of the survey team." — Project Manager, Jiangsu Marine Engineering Co., Ltd.
WE LOOK FORWARD TO WORKING WITH YOU.
We have been committed to providing high-precision measurement equipment and reliable measurement solutions for global construction, engineering, surveying, and land surveying projects.
Related Products