Total Length: 1,011 km, bridge-to-tunnel ratio 95.8%
Core Structure: 12 tunnels exceeding 1,000 meters in length, 18 major bridges, crossing 5 major river systems (Jinsha River, Nu River, etc.)
Geological Environment: Traverses 7 major fault zones, altitude 3,000–4,500 m, high altitude, significant elevation differences, strong winds, oxygen deficiency, frequent landslides/debris flows
Construction Period/Investment: 2020–2026, a national strategic project, total investment exceeding 300 billion RMB
Aug. 17, 2026
Surveying Challenges
• Extreme Elevation Differences: Single-section elevation differences can reach 1,000 m+, conventional surveying methods lack visibility, atmospheric refraction has a significant impact
• Extremely Long Tunnels: Multiple tunnels >15 km, internal control network requires millimeter-level connection
• Harsh Environment: -20℃ low temperature, 8 Strong winds, high UV radiation, and large diurnal temperature range pose high risks to instrument stability and personnel operations.
• Difficulty in elevation transfer: Long-distance leveling in uninhabited areas, with a closure error requirement of <2 mm per kilometer.
Technical Challenges
Domestic Surveying Solutions
Brands: Southern Surveying and Mapping / Suzhou Yiguang (FOIF) and other domestic and international brands
(1) Southern Surveying and Mapping NTS-362R10 Total Station (Tunnel/Bridge Main Control)
Angle measurement accuracy: 2″; Prism-free: 1,000 m
Application scenarios: Tunnel traverse, entrance and exit connection measurement, bridge pier positioning, alignment control, verticality detection
Key function: Ensure the completion of all 12 kilometer-long tunnels, with a lateral error ≤3 mm
(2) Suzhou Yiguang EL03 Electronic Level (Elevation/Settlement Main Control)
Accuracy: 0.3 mm/km; Indium steel tape matching
Application scenarios: Elevation transfer in long tunnels, roadbed/bridge pier settlement monitoring, high-altitude long-distance leveling network
Key function: Elevation closure error of the entire line <2 mm; Leveling closure completed successfully on the first attempt in a 30 km uninhabited area
Key Achievements
Key Equipment Used
Tunnel breakthrough accuracy
All 12 tunnels over 1000 meters were completed without accidents, with a lateral error ≤3 mm.
Elevation accuracy
The leveling closure error along the entire line was <2 mm, meeting the requirements for high-speed railway ballastless track.
Environmental adaptability
Capable of operating at -25℃ and 8... Continuous and stable operation under strong winds and intense ultraviolet radiation, the reliability of domestically produced equipment exceeded import expectations.
Milestone in localization
For the first time in a world-class, challenging mountain railway, domestically produced total stations and levels were used throughout the entire process.
On-site Details
· High-altitude leveling: The surveying team carried instruments on foot across the uninhabited area, setting up levels on steep slopes of 30°–60°, overcoming strong winds, low temperatures, and lack of oxygen to ensure stable visibility and accurate readings.
· Tunnel entrance control: A station was set up near the unstable rock mass at the tunnel entrance. A total station was used for orientation, angle measurement, and distance measurement to monitor slope displacement in real time and prevent landslide risks.
· Traverse surveying inside the tunnel: Due to the dampness, dust, and insufficient light inside the tunnel, a total station was used for long-distance angle measurement to control the tunnel centerline and ensure precise alignment at both ends.
WE LOOK FORWARD TO WORKING WITH YOU.
We have been committed to providing high-precision measurement equipment and reliable measurement solutions for global construction, engineering, surveying, and land surveying projects.